I am going with the recommendation of Chuck Cassidy on my flooring.
Phase 1 was to gut and prep the floors to remove rust, repair/weld any holes, and prime with Chassis Saver.
Phase 2 will involve cutting, dry fitting, and eventually gluing down the rigid foam board and subfloor sheets.
Today I picked up one sheet of the rigid foam board and cut it to complete the first section in the back of the bus.

I cut the board to the width of the bus (right around 90 inches), then i trimmed off a little because it would not bend enough to squeeze past the chair rails that are a structural part of the bus. I will be able to fill in that gap with the trimmed piece (lesson learned, duct tape and glue will fix it. Cutting the foam board is a breeze with a jigsaw,


Leave a comment