20 Feet of Floor Installed

I spent all day Friday cutting and glueing Subterra Rigid Foam Board and Plywood. I finished the entire bus surface with the Rigid Foam Boards, and installed 5 of 9 sections of plywood. The bus floor is completed from the rear to the emergency exits. I have 3-4 more sheets of plywood to install.

UPDATE: Rainy Saturday, really couldn’t cut plywood outside, hoping Sunday is warmer and dryer.

Comments

Leave a comment